A selection of projects undertaken and managed by Ian Swinglehurst, whilst working as a director of Neustar Ltd. Showcasing these projects serves only to give the reader an idea of the capabilities and experience of the individual named and therefore the skills he brings to Lamb & Partners Ltd. Betjeman Place, Slough, Berkshire. Design and manage the integration of the business technology into the fabric of the two Campus buildings seating 100 and 600 people respectively. Role: Technical Consultancy and Installation Management Employer/Client: Neustar/EquantJuniper House, Boulevard de Courcelles Paris, France. Design, specification and fit out for all IT services on a 500m2 3rd floorlisted building, to provide a fully operational Paris Sales and Engineering support office. Role: Technical Consultancy and Installation Management and commissioning. Employer/Client: Neustar / Juniper NetworksBP, West London. Management of BP's core network infrastructure design, development and implementation within the European Mega Data Centre Projects and Secondary Data Centre Projects. Role: Technical Consultancy and Integration Management. Employer/Client: Neustar / BPCephalon, Welyn Garden City. Provide the specification and implementation management for the IT infrastructure and Class 1 Data, for this Cephalon’s 2500 m2 office. Role: Technical Consultancy Employer/Client: Neustar/CephalonChelsea Harbour Design Centre Extension, London. New Class 1 Data Centre including a flexible Telecommunications architecture to support office and retail space and an Audio Visual and way-finder systems. Role: Technical Consultancy Employer/Client: Neustar/Chelsea Harbour Design Centre400 Galleria, Atlanta, Georgia. USA. Initiate a global standardisation program, manage the delivery and integration of high availability data-comms, telephony services and distribution to the end user. Role: Technical Consultancy and Installation Management. Employer/Client: Neustar/EquantHeadstrong, London. A turn-key service for the preparation, delivery and occupation of Headstrong’s new City of London Offices. Role: Technical Consultancy, Installation and project and programme management. Employer/Client: Neustar/Headstrong LondonHitachi Capital: New Office - Staines. Assist the in house management team with the commissioning, operational acceptance testing and client handover aspects of the project. Role: Technical specification, design intent, Installation QM, patching & commissioning. Employer/Client: Neustar/Hitachi CapitalHitachi Capital: New Office - Trowbridge. Design and specification writing for the IT infrastructure required to sustain a new office development. Monitor installation for adherence to brief and quality assurance. Role: Technical specification, design intent, Installation QM, patching & commissioning. Employer/Client: Neustar/Hitachi CapitalImaging Research Solutions Limited (IRSL), London. Develop a project scope, including the re-design and renovation of the existing Clinical, Laboratory, Office and Communications / Data Centre accommodation. Role: Technical Consultancy. Employer/Client: Neustar/IRSL & Nycomed-Amersham Imaging (NAI) and the Medical Research Council (MRC)Jane Street Europe, London. Undertook the Employer's Requirements definition and performance specification for Trading floor and Class 1 Data Centre for their new City of London Offices. Role: Technical Consultancy. Employer/Client: Neustar/Jane Street EuropeJuniper House, Schiphol - Rijk, Netherlands. Provide a fully operational European Sales, Support and Call centre headquarters. All IT services including AC/DC power and air conditioning across two floors (1900m2) Role: Technical Consultancy and Installation Management and commissioning Employer/Client: Neustar/Juniper NetworksJuniper House, Leatherhead, Surrey. The complete design specification and fit out for all IT services to provide a fully operational UK headquarters in a new two story building. Role: Technical Consultancy and Installation Management and commissioning. Employer/Client: Neustar / Juniper NetworksKalido, London. Full scope of IT infrastructure design and specification, including Room Specifications, Capacity, Power, Heat load, Cable Topology, LAN, WAN, Voice and integrated VC and AV, with a core systems outage window limited to 45 minutes. Role: Technical Consultancy, Installation and project and programme management. Employer/Client: Neustar/KalidoMetropolitan Police Service. Develop a technical specification that met the technical infrastructure required to support this laboratory space that forensically analysed CCTV footage. Role: Technical Consultancy, Installation Management and Commissioning. Employer/Client: Neustar / Met Police – Property Services DepartmentMintz Levin, London. Provide a turn-key service for the preparation, delivery and occupation of their new City of London, Grade II Listed Offices in Ironmonger Lane. Role: Technical Consultancy, Installation Management and Commissioning. Employer/Client: Neustar/Mintz LevinNational Film & Television School, Beaconsfield. Delivery of ICT infrastructure specification, including data, voice and video in and around the new building. Role: Technical Consultancy. Employer/Client: Neustar/National School of Film & TelevisionSadler's Wells Theatre, London. Infrastructure improvements including the replacement of the voice and communications architectures and Box Office Contact Centre. Role: Technical Consultancy. Employer/Client: Neustar/Sadler's Wells Theatre CompanySpherion/KPN, Netherlands. Develop a "Managed Service Centre" (MSC); a network and systems design for 120,000 hosts, in a 100,000m2 co-location centre. Role: Technical Consultancy. Employer/Client: Neustar / Spherion/KPN